What is a Cadastral Affection Plan in Zimbabwe & How to Obtain One?

Admin January 29, 2026

A Cadastral Affection Plan (CAP) is a legal document that defines a property’s official boundaries, dimensions, zoning classification, and permissible land use. In Zimbabwe, it is issued by the Surveyor General’s Office under the Ministry of Lands, and it forms part of the official cadastral and land registry records maintained by the Deeds Registry.

It is important to distinguish between a Cadastral Affection Plan, a Title Deed, and a Site Plan. A Title Deed confirms ownership of land, while a Site Plan usually shows architectural layouts. A Cadastral Affection Plan, however, establishes the legally recognised footprint of a property and governs what can be built, modified, or subdivided.

Cadastral Affection Plans are important to buyers, developers, surveyors, banks, valuers, local authorities, and government bodies, as they underpin regulatory compliance and transactional certainty.

What Exactly Does a Cadastral Affection Plan Include?

A CAP provides a detailed legal snapshot of how a plot or property is defined and regulated.

Key Elements Typically Shown:

  • Plot number, survey number, and location
  • Boundary coordinates and adjoining plot references
  • Total land area and precise dimensions
  • Zoning classification and permitted land use (residential, commercial, industrial, or agricultural)
  • Setbacks (front, rear, and side), allowable building height, and site coverage limits
  • Roads, easements, servitudes, and utility or service corridors

Authority and Legal Standing: Cadastral Affection Plans are prepared by licensed land surveyors and must be approved by the Surveyor General. Once approved, they are registered at the Deeds Office and are legally recognised for construction approvals, property transfers, valuations, and dispute resolution.

Why a Cadastral Affection Plan is Important

1. For regulatory compliance and construction permissions:

A CAP is required for subdivision, consolidation, rezoning, or any building applications. It ensures compliance with zoning rules, setbacks, and land use restrictions before approvals are granted by local authorities such as municipalities or town councils.

2. For property transactions, financing, and dispute avoidance:

Banks, valuers, and legal practitioners rely on CAPs to verify that a property’s advertised size, use, and boundaries align with official records. This prevents disputes related to land encroachment, easements, or undeclared restrictions.

3. For urban planning and development:

Authorities use CAPs to maintain accurate cadastral records as plots are subdivided, merged, or redeveloped. They ensure that roads, utilities, and infrastructure are aligned with approved town planning schemes.

When is a Cadastral Affection Plan Needed?

A CAP is typically required when:

  • Buying vacant land or undeveloped plots
  • Subdividing or merging plots
  • Applying for building permits, extensions, or renovations
  • Valuation, mortgage registration, or refinancing
  • Resolving boundary or ownership disputes
  • Making major modifications affecting land use or building footprint

How to Obtain a Cadastral Affection Plan in Zimbabwe

Step 1: Engage a Licensed Land Surveyor

All CAPs must be prepared by surveyors registered with the Surveyors Council of Zimbabwe.

Step 2: Submit to the Surveyor General

The surveyor submits the plan to the Surveyor General’s Office for approval. The CAP will then be officially recorded in the cadastre system.

Step 3: Required Documents

Applicants typically submit:

  • Title Deed or proof of ownership
  • Surveyor’s field notes and technical drawings
  • Site plan or previous CAP (if available)
  • No Objection Certificates (NOCs) from relevant authorities, where applicable

Step 4: Processing Time and Fees

  • Standard applications can take 1–4 weeks, depending on complexity
  • Fees vary depending on the property size and location and include surveyor’s fees, government charges, and registration costs

Common Pitfalls and How to Avoid Them

  • Mismatched survey or title details — ensure names, plot numbers, and survey numbers match official records
  • Outdated plans — always verify the CAP reflects recent subdivisions or mergers
  • Missing approvals or NOCs — check with local councils or developers for any required clearance
  • Ignoring zoning restrictions or servitudes — ensure the proposed use complies with approved land-use regulations

Real-World Scenarios

  • A buyer verifies the official boundaries of a rural farm before completing a land purchase
  • A developer uses a CAP to confirm allowable building height and setbacks before constructing a residential estate
  • A municipality updates town planning records after a large subdivision is approved

Key Takeaways

  • A Cadastral Affection Plan legally defines a property’s boundaries, zoning, and permissible use.
  • It is essential for construction approvals, property transfers, valuations, and dispute resolution.
  • CAPs must be prepared by licensed land surveyors, approved by the Surveyor General, and registered at the Deeds Office.
  • Always confirm that the CAP matches the advertised or intended property details before completing major transactions.
Share this article

More Articles

Subscribe to our newsletter